FINAL PROGRAM | |
Location: Hall Graz |
| |
11:00 - 12:20 |
Session G1: Evacuation Location: Hall Graz Chair: Frédéric Waymel, Egis Group, France Influence of Acoustic Tunnel Monitoring AKUT on Tunnel Safety 1: ILF Consulting Engineers Austria GmbH, AT; 2: ASFINAG, AT; 3: Joanneum Research, AT 11:20 - 11:40 Evacuation Safety and Human Emotional Responses in Smoke-Filled Tunnels for Machine Learning Insights Hiroshima University, JP 11:40 - 12:00 A 3D Parametric Study To Assess the Impact of a Fixed Fire Fighting System on the Evacuation Conditions in Paris La Défense Road Tunnels EGIS, FR 12:00 - 12:20 Fire Risks of Battery-Powered Trucks in Tunneling 1: Graz University of Technology, Institute of Thermodynamics and Sustainable Propulsion Systems, Austria; 2: ILF Consulting Engineers Austria GmbH, AT; 3: Sovik Consulting |
13:30 - 14:50 |
Session G2: Commissioning Location: Hall Graz Chair: René List, ASFINAG Baumanagement GmbH, Austria Rehabilitation of Boston Harbour Tunnel – The “Quarter Duct” Solution 1: Stacey Agnew, AU; 2: Delve Stacey Agnew, US 13:50 - 14:10 Commisioning of Tunnels Multiconsult Norge AS, NO 14:10 - 14:30 Enhancing Tunnel Fan Reliability Through Advanced Factory Acceptance Test (AFAT) to Prevent Failures 1: S&P-KRUGER Underground Ventilation Division, ES; 2: KRUGER ASIA Ventilation Group, TH; 3: SOLER & PALAU Ventilation Group, ES 14:30 - 14:50 Advances in the Digital Documentation of Railway Tunnel Inspection 1: Graz University of Technology, AT; 2: recordIT GmbH, AT; 3: ÖBB Infrastruktur AG, AT |
15:30 - 16:30 |
Session G3: Simulation Location: Hall Graz Chair: Antoine Mos, CETU - Centre d'études des tunnels, France Particle Concentration Levels in a Subway Station - The Effects of Various Locations and Diameters of Relief Shafts in Tunnels EQUA Simulation AB, SE 15:50 - 16:10 Emission Management in Railway Tunnels With a 1D-3D Simulation Approach 1: Dassault Systèmes Deutschland GmbH, DE; 2: Dassault Systèmes SE, FR; 3: Dassault Systèmes AB, SE 16:10 - 16:30 Application of ARTU Software and Multizone Fire Modelling for Risk Analysis: A Road Tunnel Case Study Cantene, IT |
| |
9:00 - 10:20 |
Session G4: Risk Analysis Location: Hall Graz Chair: Norris Harvey, Mott MacDonald, United States of America Risk Analysis of Road Tunnels: A Quantitative Risk Analysis Model for Assessing the Effects of Fire 1: LONDON BRIDGE ASSOCIATES LTD., GB; 2: National University of Malaysia, MY 9:20 - 9:40 Some Questions Related to CFD Modeling of Pressurized Tank Burst in Road Tunnels 1: INERIS, FR; 2: CETU, FR 9:40 - 10:00 Integration of New Energy Carriers in French Specific Hazard Investigations: Overview of Principal Issues CETU, French tunnel study centre, FR 10:00 - 10:20 Innovative Approach To Improve the Safety of Tunnels and Tunnel Control Centres 1: ILF Consulting Engineers Austria GmbH, AT; 2: Federal Highway Research Institute, DE |
11:00 - 12:20 |
Session G5: Tunnel Ventilation Location: Hall Graz Chair: Sonja Wiesholzer, Schiene OÖ GmbH, Austria On the Optimum Interaction Between Ventilation and Emergency Exits Amberg Engineering AG, CH 11:20 - 11:40 Advanced Characterisation of a Fan Submitted to Piston Effect 1: Eiffage, Ventilation des Espaces Souterrains, FR; 2: Tech'Am Ingenierie, FR 11:40 - 12:00 Optimizing Safety in Short High-Slope Road Tunnels: Smoke Propagation and Ventilation System Response 1: CTP PROJEKT d.o.o., HR; 2: IN SILICO d.o.o, HR; 3: INVENTO VENTILACIJA d.o.o., HR 12:00 - 12:20 How Information Security Can Be Ensured in Tunnel Systems ASFINAG Mautservice GmbH, AT |