Conference Agenda

Highly interesting, high-quality presentations on many different topics will be presented in parallel sessions, providing the basis for lively discussions among the experts in attendance. Below you will find an overview and details of the sessions of our International Conference.

As usual, all presentations will be simultaneously translated into English and German!

Venue: Messecongress Graz (Messeplatz 1, 8010 Graz)

PDF: Download the program

Please note that all times are shown in the time zone of the conference. The current conference time is: 20th May 2024, 10:42:28 CEST

 
 
FINAL PROGRAM
Session
Keynote Speakers
Time:
Tuesday, 16/Apr/2024:
9:15 - 10:15

Location: Hall Styria


Show help for 'Increase or decrease the abstract text size'
Presentations
9:15 - 9:35

The 33 KM Long Koralm Tunnel – Final Challenges in the Implementation of a Major Project

Klaus Schneider, Helmut Steiner

ÖBB Infrastruktur AG, AT

Abstract



9:35 - 9:55

Current Status of the Semmering Base Tunnel

Gerhard Gobiet, Thomas Thaller

ÖBB Infrastruktur AG, AT

Abstract



9:55 - 10:15

Tunnel Renovation Program AUSTRIA - Next Level

Andreas Fromm

ASFINAG, AT

Within the framework of the ASFINAG tunnel renovation and extension programme based on the EU directive on road tunnel safety, around 50 individual projects were completed in the TERN network with a total volume of around EUR 1.7 billion. As of April 2019, all relevant projects have been successfully completed on schedule, thus significantly increasing tunnel safety in Austria.

ASFINAG is now facing the next major challenges. These are due to the ageing of facilities, IT security requirements, electricity saving requirements, short life cycles of safety equipment and finally also due to the necessary compliance with the EU directive on road tunnel safety 2029 in Austria's Non TERN network. The investment volume required for this is more than EUR 3.5 billion until 2035 and the actual measures required are still being evaluated on an ongoing basis. This enormous project and investment volume presents ASFINAG with almost insurmountable tasks. These begin with maintaining tunnel availability for users and end with the actual feasibility in cooperation with stakeholders, planning companies, construction companies, authorities, equipment suppliers. It is also questionable whether sufficient capacity is available at suppliers and in the personnel sector. In order to ensure the feasibility of this Next Level Programme, strategic and operational concepts with effective measures are urgently needed. Without these, a sufficient level of safety in Austrian motorway tunnels will not be sustainable in the long term.

An overview of the projects, tasks and topics presented is given and the first measures and activities already initiated by ASFINAG are presented.



 
Contact and Legal Notice · Contact Address:
Privacy Statement · Conference: TSV Graz 2024
Conference Software: ConfTool Pro 2.6.149+CC
© 2001–2024 by Dr. H. Weinreich, Hamburg, Germany